Acquiring satellite imagery
ABU DHABI — 24.50°N 54.49°E
SENTINENTALAIRSPACE OPERATIONS
← Back to site
Concept visualisation
Phase 02 — 2028–2031
Not an operational system
//Corridor Structure
PATROL — 60mSite-local sorties
TRANSIT — 90mInter-site, one-way
CARGO — 120mPhase 03 — eVTOL
NODESGround stations
RESTRICTEDControlled airspace
//Network
—Ground Nodes
—Corridors
—Network km
—Units Airborne
DRAG TO LOOK · SCROLL TO ZOOM
HOVER A NODE FOR DETAIL
CONCEPT ONLY. Corridors, nodes and altitudes are illustrative — not flown, filed, or approved. Vertical scale exaggerated ~60× for legibility. Restricted zones indicative, not an authoritative airspace source. Imagery © Esri, Maxar, Earthstar Geographics.